Mesh mould metal
Since 2015, the Zurich-based research group Gramazio Kohler Research has been developing ‘mesh mould metal’. This is a project studying the unification of concrete reinforcement and formwork into a single, robotically-fabricated material system.
The first (2012-14) phase of research, ‘Mesh mould’, addressed the 1:1 construction aspects of robotically-fabricated load-bearing structures, and a robotic extrusion process for a polymer mesh.
The second phase, ‘Mesh mould metal’, has focused on the transition of the structurally-weak polymer-based extrusion process into a fully load-bearing construction system, by replicating the process in metal.
The research involves the development of ‘a fully automated bending and welding process for meshes fabricated from 3 mm steel wire.’
Standard industrial robots have limited payload capacities yet have a high capacity for precise spatial coordination. Therefore, their optimal use requires construction processes with minimal mass transfer and a high degree of geometric definition. Subsequently, the focus of the investigation was fabrication with material efficiency in mind, with geometrically complex concrete elements.
The project was conducted in collaboration with Sika Technology AG. Mesh Mould is also embedded into the National Competence Centre in Research (NCCR) Digital Fabrication, and funded by the Swiss National Science Foundation.
Images copyright Gramazio Kohler Research, ETH Zurich.
Content and images courtesy of GKR. For more information, see GKR.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.